Checklist
Material in home removed & skirting is laid down
Home is positioned properly on pad
Piers laid out per manual and correct loading info, no broken blocks
Cribbing Setup Properly
Leveled to less than ¼’’ of variance across all piers
Floor, roof and wall fastening complete per installation manual instructions
Roof has been inspected / repaired from shipping holes and any damage
Furnace cap has been installed
PVC drain lines have been connected to sewer with ¼’’ / ft slope and cleanout
Furnace condensation drain line run to exterior of skirting w/screen
Dryer vent has been vented outside of skirt and supported
Ground anchor system has been completed and properly tensioned per installation manual
Marriage line piers installed as needed (openings 4ft or greater)
Skirting, siding soffit and fascia compete on ends if applicable
Exterior coach lights installed with bulb
Complete detailed fit and finish inspection of interior and exterior for damage and correct as needed
Dryer Vented through skirting properly per installation manual
Ship lose materials removed and light bulbs installed
Mate line doors and trim complete (double wide only)
Exterior door adjustments are complete and acceptable.
Gas, water, grounding and HVAC crossovers complete (double wide homes only)
Shipping materials have been removed and placed in receptacle
Exterior of home is clean including removal of all extra materials
Rough clean complete including removal of shipping materials
Foundation meets minimum HUD and manufacturer installation manual criteria
Submit any defects including parts needed to complete to the manufacturer.
Crew leader:
Save
Date:
Submit